/
A.D. GROUP OF CONSTRUCTION
VerifiedA.D. GROUP OF CONSTRUCTION
Public Preview Meerut •1 Authorities•7 Bids
Bid Lifecycle DistributionBy ₹ Value
₹37.6 L
₹52.4 L
Won (3)
₹37.6 LFinance Rej (2)
₹52.4 LTech/Scrutiny (0)
₹0Outbid/Other (0)
₹0Awarded Value
₹37.6 L
3 won
Win Rate
42.9%
Avg. Deal: ₹12.5 L
Avg. Bid Size
₹12.9 L
across 7 tenders
Total Bids
7
state tenders
Annual Performance & Win Trajectory
41.7% Won
Value Captured: ₹37.6 L
Pool: ₹90.1 L
| Fiscal Year | Tenders Contested | Contracts Won | Annual Win Rate | Won Value (INR) |
|---|---|---|---|---|
| 2026 | 3 tenders | 3 wins | 100% | ₹37.6 L |
| 2025 | 4 tenders | 0 wins | 0% | ₹0 |
Geographic Operating Footprint
Uttar Pradesh District Intensity
Hover or click district to filter tenders
Work Frequency:
0 Bids
Low
Medium
High
Highest
Auraiya
3 bids (3 won)
₹37.6 L
Won contracts Farrukhabad
4 bids (0 won)
₹0
Unawarded Competitor Intelligence Radar
Competitor Entity ↕ | Shared Tenders ↓ | Rival Wins ↕ | Rival Won Value ↕ | Head-to-Head Duel | A.D. GROUP OF CONSTRUCTION Won Value ↕ |
|---|---|---|---|---|---|
1 M/S GARGI CONSTRUCTION #1 Arch-Rival | 4 shared | 3 Won | ₹40.2 L | ₹0 0 won | |
2 M/S VICTORY CONSTRUCTION AND SUPPLIER #2 Major Rival | 4 shared | 1 Won | ₹12.0 L | ₹0 0 won | |
3 M/s KK Construction & Suppliers | 3 shared | 0 Wins | ₹0 | ₹37.6 L 3 won |
Showing Top 3 Competitors (Capped Public Preview)
Sign in or upgrade to Pro to unlock the full co-bidding syndicate matrix and head-to-head win spreads across all shared tenders.
Tender History & Bid Outcomes
| Tender & Authority | Estimate ↕ | Contractor Quote ↕ | Winning Quote ↕ | Rank | Outcome Status |
|---|---|---|---|---|---|
| Painting and repair work in the examination control room and chemistry laboratory of Shri Janata Inter College in the development...↗ 1652/RED/Account/Tender No/25-26 Dt 09.03.2026 · 2026-04-04T11:00:00 Director Cum Chief Engineer RED Auraiya | ₹10.8 L | ₹10.7 L -0.2% vs est. | ₹10.7 L ★A.D. GROUP OF CONSTRUCTION | L1 | ACCEPTED - AOC |
| Repair work of the roofs of rooms No. 38 to No. 45 of the girls section of Shri Janata Inter...↗ 1652/RED/Account/Tender No/25-26 Dt 09.03.2026 · 2026-04-04T11:00:00 Director Cum Chief Engineer RED Auraiya | ₹10.5 L | ₹10.5 L -0.2% vs est. | ₹10.5 L ★A.D. GROUP OF CONSTRUCTION | L1 | ACCEPTED - AOC |
| Maintenance work at the District Magistrate Office campus located at Kakor Headquarters in Auraiya District (Part-3)↗ 1671/RED/Account/Tender No/25-26 Dt 12.03.2026 · 2026-03-30T11:00:00 Director Cum Chief Engineer RED Auraiya | ₹16.4 L | ₹16.3 L -0.4% vs est. | ₹16.3 L ★A.D. GROUP OF CONSTRUCTION | L1 | ACCEPTED - AOC |
| CC road from Farrukhabad Badaun route to Ju Ha School Rajpur and drainage work as needed↗ 534988/EEREDFBD/25-26 DT 26-10-2025 · 2025-11-19T12:00:00 Director Cum Chief Engineer RED Farrukhabad | ₹12.0 L | ₹12.0 L 0% vs est. | ₹12.0 L M/S VICTORY CONSTRUCTION AND SUPPLIER | L2 | REJECTED - FINANCE |
| CC road and drainage work from Gram Dabri Rajepur road to PPA Dabri as required↗ 534988/EEREDFBD/25-26 DT 26-10-2025 · 2025-11-19T12:00:00 Director Cum Chief Engineer RED Farrukhabad | ₹14.3 L | ₹14.3 L -0.1% vs est. | ₹14.3 L M/S GARGI CONSTRUCTION | L2 | REJECTED - FINANCE |
Contractor Ledger Preview • Showing 5 of 7 Tenders
Historical Tender Ledger Capped
Sign in or upgrade to Contracq Pro to unlock the full bidding history, line-item quote variances against official estimates, winning quotes, and official BOQ downloads.