/
DS CONTRACTOR
VerifiedDS CONTRACTOR
Public Preview Clearance of Kirawali, Nagla Parmal, Gopau Drain •2 Authorities•9 Bids
Bid Lifecycle DistributionBy ₹ Value
₹3.1 L
₹67.9 L
₹17.7 L
Won (2)
₹3.1 LFinance Rej (1)
₹67.9 LTech/Scrutiny (0)
₹17.7 LOutbid/Other (0)
₹0Awarded Value
₹3.1 L
2 won
Win Rate
28.6%
Avg. Deal: ₹1.5 L
Avg. Bid Size
₹10.8 L
across 9 tenders
Total Bids
9
state tenders
Annual Performance & Win Trajectory
3.2% Won
Value Captured: ₹3.1 L
Pool: ₹97.2 L
| Fiscal Year | Tenders Contested | Contracts Won | Annual Win Rate | Won Value (INR) |
|---|---|---|---|---|
| 2026 | 6 tenders | 2 wins | 33.3% | ₹3.1 L |
| 2025 | 3 tenders | 0 wins | 0% | ₹0 |
Geographic Operating Footprint
Uttar Pradesh District Intensity
Hover or click district to filter tenders
Work Frequency:
0 Bids
Low
Medium
High
Highest
Clearance of Mandigur, Undera Drain
1 bids (1 won)
₹1.7 L
Won contracts Clearance of Beman Tikari Drain
1 bids (1 won)
₹1.4 L
Won contracts As Per Tender Document
2 bids (0 won)
₹0
Unawarded NPP, BAGHPAT
2 bids (0 won)
₹0
Unawarded E/W in Silt clearance/Scrapping of Pindora Dy from
1 bids (0 won)
₹0
Unawarded Scraping of Internal Section of Biprawali Dy. From
1 bids (0 won)
₹0
Unawarded As Per NIT
1 bids (0 won)
₹0
Unawarded Competitor Intelligence Radar
Competitor Entity ↕ | Shared Tenders ↓ | Rival Wins ↕ | Rival Won Value ↕ | Head-to-Head Duel | DS CONTRACTOR Won Value ↕ |
|---|---|---|---|---|---|
1 M/S KRISHNA CONTRACTOR & SUPPLIER #1 Arch-Rival | 2 shared | 0 Wins | ₹0 | ₹0 0 won | |
2 SHRI KRISHAN CONTRACTOR #2 Major Rival | 2 shared | 0 Wins | ₹0 | ₹3.1 L 2 won | |
3 UPADHYAY CONSTRUCTION | 2 shared | 0 Wins | ₹0 | ₹0 0 won |
Showing Top 3 Competitors (Capped Public Preview)
Sign in or upgrade to Pro to unlock the full co-bidding syndicate matrix and head-to-head win spreads across all shared tenders.
Tender History & Bid Outcomes
| Tender & Authority | Estimate ↕ | Contractor Quote ↕ | Winning Quote ↕ | Rank | Outcome Status |
|---|---|---|---|---|---|
| E/W in Silt clearance/Scrapping of Pindora Dy from km 0.000 to 7.200.↗ 03/EE/2026-27 · 2026-09-10T18:00:00 U P Irrigation Department (Civil) E/W in Silt clearance/Scrapping of Pindora Dy from | ₹2.3 L | — | Pending | — | UNDER EVALUATION |
| Scraping of Internal Section of Biprawali Dy. From. km 0.000 to km. 8.000↗ 03/EE/2026-27 · 2026-09-10T16:40:00 U P Irrigation Department (Civil) Scraping of Internal Section of Biprawali Dy. From | ₹2.5 L | — | Pending | — | UNDER EVALUATION |
| Clearance of Beman Tikari Drain↗ 01/EE/2026-27 · 2026-05-28T10:00:00 U P Irrigation Department (Civil) Clearance of Beman Tikari Drain | ₹3.5 L | ₹1.4 L -60.5% vs est. | ₹1.4 L ★DS CONTRACTOR | L1 | ACCEPTED - AOC |
| Clearance of Mandigur, Undera Drain↗ 01/EE/2026-27 · 2026-05-28T10:00:00 U P Irrigation Department (Civil) Clearance of Mandigur, Undera Drain | ₹3.3 L | ₹1.7 L -48.1% vs est. | ₹1.7 L ★DS CONTRACTOR | L1 | ACCEPTED - AOC |
| TN-09/EE/2025-26 Reconstruction work of the damaged bridge located at Km 3.989 of Mahalwala drain. Lot No-1↗ TN-09/EE/2025-26 · 2026-02-21T10:00:00 U P Irrigation Department (Civil) As Per NIT | ₹33.3 L | ₹25.0 L -24.8% vs est. | ₹23.0 L SINGHWAL INDUSTRIES | L7 | REJECTED - FINANCE |
Contractor Ledger Preview • Showing 5 of 9 Tenders
Historical Tender Ledger Capped
Sign in or upgrade to Contracq Pro to unlock the full bidding history, line-item quote variances against official estimates, winning quotes, and official BOQ downloads.