/
SHRI RAM LAUT
VerifiedSHRI RAM LAUT
Public Preview SULTANPUR •2 Authorities•14 Bids
Bid Lifecycle DistributionBy ₹ Value
₹49.2 L
₹1.5 Cr
₹55.4 L
Won (3)
₹49.2 LFinance Rej (1)
₹1.5 CrTech/Scrutiny (1)
₹55.4 LOutbid/Other (0)
₹0Awarded Value
₹49.2 L
6 won
Win Rate
42.9%
Avg. Deal: ₹8.2 L
Avg. Bid Size
₹18.6 L
across 14 tenders
Total Bids
14
state tenders
Annual Performance & Win Trajectory
18.9% Won
Value Captured: ₹49.2 L
Pool: ₹2.6 Cr
| Fiscal Year | Tenders Contested | Contracts Won | Annual Win Rate | Won Value (INR) |
|---|---|---|---|---|
| 2026 | 11 tenders | 5 wins | 45.5% | ₹12.5 L |
| 2025 | 3 tenders | 1 wins | 33.3% | ₹36.8 L |
Geographic Operating Footprint
Uttar Pradesh District Intensity
Hover or click district to filter tenders
Work Frequency:
0 Bids
Low
Medium
High
Highest
SULTANPUR
14 bids (6 won)
₹49.2 L
Won contracts Competitor Intelligence Radar
Competitor Entity ↕ | Shared Tenders ↓ | Rival Wins ↕ | Rival Won Value ↕ | Head-to-Head Duel | SHRI RAM LAUT Won Value ↕ |
|---|---|---|---|---|---|
1 MOHD AMEEN #1 Arch-Rival | 7 shared | 0 Wins | ₹0 | ₹12.5 L 5 won | |
2 SKD GROUP OF CONSTRUCTION #2 Major Rival | 4 shared | 0 Wins | ₹0 | ₹41.3 L 3 won | |
3 M/S GAYATRI CONSTRUCTION | 2 shared | 1 Won | ₹55.9 L | ₹0 0 won |
Showing Top 3 Competitors (Capped Public Preview)
Sign in or upgrade to Pro to unlock the full co-bidding syndicate matrix and head-to-head win spreads across all shared tenders.
Tender History & Bid Outcomes
| Tender & Authority | Estimate ↕ | Contractor Quote ↕ | Winning Quote ↕ | Rank | Outcome Status |
|---|---|---|---|---|---|
| Construction of a 3x3x3 meter RCC box culvert to replace the existing damaged minor bridge over the Redahwa Nala (drain)...↗ 1226/1com-Sul.A.Cir./2025-26 Date 23.03.2026 · 2026-04-01T09:00:00 Chief Engineer PWD Faizabad Zone SULTANPUR | ₹45.0 L | — | ₹48.2 L SARVESH KUMAR SINGH | Tech Disqualified | NOT ADMITTED - TECH |
| Renwal work Muili Chandpur to Surapur Link Road↗ 1005/2A/2025-26 Date-06.03.2026 · 2026-03-15T09:00:00 Chief Engineer PWD Faizabad Zone SULTANPUR | ₹2.8 L | ₹2.7 L -1.3% vs est. | ₹2.7 L ★SHRI RAM LAUT | L1 | ACCEPTED - AOC |
| Renwal work Chamaroti Link Road↗ 1005/2A/2025-26 Date-06.03.2026 · 2026-03-15T09:00:00 Chief Engineer PWD Faizabad Zone SULTANPUR | ₹1.8 L | ₹1.8 L -2.1% vs est. | ₹1.8 L ★SHRI RAM LAUT | L1 | ACCEPTED - AOC |
| Renwal work Sonupara link road↗ 1005/2A/2025-26 Date-06.03.2026 · 2026-03-14T17:00:00 Chief Engineer PWD Faizabad Zone SULTANPUR | ₹12.6 L | ₹12.4 L -1.5% vs est. | ₹11.9 L M/S SURYA CONSTRUCTIONS | L2 | REJECTED - FINANCE |
| Renwal work Purva Link Road↗ 1005/2A/2025-26 Date-06.03.2026 · 2026-03-14T09:00:00 Chief Engineer PWD Faizabad Zone SULTANPUR | ₹1.8 L | ₹1.8 L -0.5% vs est. | ₹1.8 L ★SHRI RAM LAUT | L1 | ACCEPTED - AOC |
Contractor Ledger Preview • Showing 5 of 14 Tenders
Historical Tender Ledger Capped
Sign in or upgrade to Contracq Pro to unlock the full bidding history, line-item quote variances against official estimates, winning quotes, and official BOQ downloads.